Tuesday, August 30, 2011

Irrigation oddity

The "main" to the SIG area is from the small conference center. There is a cut-off valve, and regulator on a 3/4" line. Odd thing is the pvc pipe used to extend it is 1".

Saturday, August 27, 2011

Tools & Supplies

My two assistants and I got lots of the initial tools, supplies and shelving. Anyone know what the tool is next to my left knee? This is first batch of tools, as we're assuming we'll have 10 regular volunteers, so we'll need to tool up for this number. Note the 2x4's in back and new shelving box in corner of picture.

Thursday, August 25, 2011

Water Use Area & Drainage



After the VC crew cleaned up the parking lot, we quickly discovered that we had not accounted for this. The 2 parking lot sections slop into the SIG and we're installing drains into the storm drain.


We're going to add wash area under each of the bib's with crushed rock so things stay more orderly. The DG will simply get mucky. We'll add boarder, remove DG and fill with crushed rock.

Wednesday, August 24, 2011

More irrigation

Oh the woe's of irrigation... Antonio found out that the line from the main had dirt in it, and it clogged up the filter. This is now fixed. Only to find that main by greenhouses had a joint problem, which is now fixed (pictured above). As my friend once said "Making a mistake is not the issue, it's how quick you fix them". Thanks Valley Crest and Facilities!

Friday, August 19, 2011

Bib's finished



The double spigot bib's will be very handy: hook hose up on bottom and still have another spigot handy. One bib on shed, and another by garden area. The irrigation controller electrical was finished (yellow cord). Also the water and electrical were finished up in the green houses. Very nice progress.

Thursday, August 18, 2011

Irrigation

Above: Irrigation controller, electric & future hose bib

Above: Potable water main line, outside fence, with filter (130 micron) and cut-off valve

Above: Valve box. Rainbird valves with pressure regulator inserts (25psi)



Above: 2nd future hose bib and 3 unfinished laterals.

All SIG water is potable and filtered (130 micron). The irrigation system includes 6 valves throughout the 3 garden areas and all pressure is at 25psi, for micro emitters. The hose bibs will be terminated with dual spigots, so if a hose is attached, you can still use the 2nd spigot.

Wednesday, August 17, 2011

Building pad's uneven

The 4 building pads on the landscape drawing were not leveled nor even when the site prep was done by Valley Crest. No attempt was made, nor when asked about this later, the answer was simply "it was to contract". All knowledgable visitors ask about why the pads were not done. The shed will have to a footing and skirt added.