The 4 building pads on the landscape drawing were not leveled nor even when the site prep was done by Valley Crest. No attempt was made, nor when asked about this later, the answer was simply "it was to contract". All knowledgable visitors ask about why the pads were not done. The shed will have to a footing and skirt added.Wednesday, August 17, 2011
Building pad's uneven
The 4 building pads on the landscape drawing were not leveled nor even when the site prep was done by Valley Crest. No attempt was made, nor when asked about this later, the answer was simply "it was to contract". All knowledgable visitors ask about why the pads were not done. The shed will have to a footing and skirt added.