The "main" to the SIG area is from the small conference center. There is a cut-off valve, and regulator on a 3/4" line. Odd thing is the pvc pipe used to extend it is 1".
Tuesday, August 30, 2011
Saturday, August 27, 2011
Tools & Supplies
My two assistants and I got lots of the initial tools, supplies and shelving. Anyone know what the tool is next to my left knee? This is first batch of tools, as we're assuming we'll have 10 regular volunteers, so we'll need to tool up for this number. Note the 2x4's in back and new shelving box in corner of picture.
Labels:
Tools
Thursday, August 25, 2011
Water Use Area & Drainage
After the VC crew cleaned up the parking lot, we quickly discovered that we had not accounted for this. The 2 parking lot sections slop into the SIG and we're installing drains into the storm drain.
We're going to add wash area under each of the bib's with crushed rock so things stay more orderly. The DG will simply get mucky. We'll add boarder, remove DG and fill with crushed rock.
Labels:
Irrigation
Wednesday, August 24, 2011
More irrigation
Oh the woe's of irrigation... Antonio found out that the line from the main had dirt in it, and it clogged up the filter. This is now fixed. Only to find that main by greenhouses had a joint problem, which is now fixed (pictured above). As my friend once said "Making a mistake is not the issue, it's how quick you fix them". Thanks Valley Crest and Facilities!
Labels:
Facilities,
Irrigation,
Site Prep,
Valley Crest
Friday, August 19, 2011
Bib's finished
The double spigot bib's will be very handy: hook hose up on bottom and still have another spigot handy. One bib on shed, and another by garden area. The irrigation controller electrical was finished (yellow cord). Also the water and electrical were finished up in the green houses. Very nice progress.
Labels:
Irrigation,
Site Prep
Thursday, August 18, 2011
Irrigation
Above: Irrigation controller, electric & future hose bib
Above: Potable water main line, outside fence, with filter (130 micron) and cut-off valve
Above: Valve box. Rainbird valves with pressure regulator inserts (25psi)
Above: 2nd future hose bib and 3 unfinished laterals.
All SIG water is potable and filtered (130 micron). The irrigation system includes 6 valves throughout the 3 garden areas and all pressure is at 25psi, for micro emitters. The hose bibs will be terminated with dual spigots, so if a hose is attached, you can still use the 2nd spigot.
Labels:
Irrigation
Wednesday, August 17, 2011
Building pad's uneven
The 4 building pads on the landscape drawing were not leveled nor even when the site prep was done by Valley Crest. No attempt was made, nor when asked about this later, the answer was simply "it was to contract". All knowledgable visitors ask about why the pads were not done. The shed will have to a footing and skirt added.
Labels:
Shed,
Site Prep,
Valley Crest
Tuesday, August 16, 2011
Day 12: shed & prep
The storage shed is "finished". We found that the locations for the greenhouses and the shed were not leveled properly originally. Thus the shed will have to be trimmed with hardware cloth to keep critters out. The greenhouses need to have the plot leveled, and the water electrical runs extended. Also Anthony wanted a large fish tub installed, which the facilities crew is doing. We thought we might get a back-hoe...
Labels:
Facilities,
Shed,
Site Prep
Monday, August 15, 2011
Day 11: Shed
The shed from Tuff Shed was delivered and installed today (took all day!). Windows on the back for natural light, door facing work area and opening with prevailing wind, work bench and shelves will be helpful. When I do this again (??), I'll make sure the pad is level, as we now have to go back and make sure the leveling gaps don't become to home to canyon critters. Video: click here.
Andy, Simon and Javier from facilities are figuring out how to level the 2 green houses and the dimensions for the large fish tub. Andy had the great idea to get the on-campus back-hoe to dig the hole for it.
Labels:
Facilities,
Shed,
Site Prep,
video
Wednesday, August 10, 2011
Day 10: Site prep
Grand-D came by with mother, Callie, and visited today. Valley Crest continues finishing up: DG is mostly complete, final pieces of irrigation, and topping garden area with layer of compost (nice touch). Got soil sample and sent to Wallace Laboratories, "Standard Agricultural Soil Suitability Analysis" test. TufShed called about delivering shed... but site needs to be deemed "finsihed" first.
Labels:
Site Prep,
Soil,
Valley Crest
Tuesday, August 9, 2011
Day 7: Site prep
Valley Crest is wrapping up the DG installation. We finalized the changes for the garden irrigation system, including a provision for 3 oak trees inside the garden. Met with fencing contractor today, and we're looking at "Design Master Fencing", the same as used at the Fullerton Arboretum. Video: click here.
Labels:
Fencing,
Site Prep,
Valley Crest,
video
Friday, August 5, 2011
Day 5: Site prep
Two colors of DG, the lighter color is already on path. Valley Crest crew is laying edging on path. Trenching is complete and Facilities has already run electrical.
Labels:
Site Prep,
Valley Crest
Wednesday, August 3, 2011
Day 3: laying out
The site has been leveled, general layout chalked in, the main trenching for potable water has been run, and pictured the trail border material is being installed. This border will help keep the DG in place. Video Tour: click here. Video trencher: click here.
Labels:
Irrigation,
Site Prep,
Valley Crest,
video
Monday, August 1, 2011