The backflow has been relocated to a low-traffic place by the garden shed. Also a master valve and cut-off valve were added. The cut-off allows us to turn water off only for the irrigation portion, and not for whole SIG. The master valve keeps the water off when there is a broken piple. All very nice.
Friday, December 30, 2011
Tuesday, December 27, 2011
Back flow?
The irrigation backflow installed is about knee-high on the main path. There was a monumental disconnect with the corrective work and "fixing" things. I will be meeting with Valley Crest irrigation specialist and see where this can be relocated out of harms way and still be compliant with Moulton Niguel Water District's approved irrigation plan that deems the sites water drinkable.
Labels:
Irrigation,
Valley Crest
Wednesday, December 21, 2011
More on irrigation
Above shows where "main" to greenhouses runs: starting over 9 feet from curb and runs through 2 of the future garden areas. Also a lateral for the oaks is run through this trench as to 2 of the 3 oaks. In the design phase, I had made it very clear I wanted no pipe run through garden areas. I had a conversation with Valley Crest and approved running main in area 3 feet from curb, as there was already existing items in there.
Labels:
Irrigation,
Site Prep,
Valley Crest
Sunday, December 11, 2011
Final Work Day 2001
Leia, Elizabeth, Yona & Emily helped sift the compost on our last compost day for 2011. We'll let this sit for 3-5 weeks to "finish". With the new landscape material being chipped/shredded we should not have to do as much sifting. We also went over worm composting. Time lapse picture over 10 hours at SIG looking north.
Friday, December 9, 2011
Irrigation Changes
Above are many of the irrigation changes: combining valves, isolating onto own line and installing backflow between them and main line. Also all laterals will be run through walk areas, and removed from the garden areas.
Labels:
Irrigation,
Site Prep,
Valley Crest
Back flow
Retrenching main line to SIG from Small Conference Center
The Moulton Niguel Water District discovered on a site inspection that the main line to SIG was not to code: within 10 feet of reclaimed water line and not clearly marked. Most of this line was retrenched to Small Conference Center. MNWD also sited that the irrigation lines were co-mingled with the faucets and required a backflow be installed, pictured above.
Labels:
Irrigation,
Site Prep,
Valley Crest
Thursday, December 8, 2011
First Aid Kit
Cliff, Director of Security, set us up with a first aid kit... hopefully something we won't have to use much... or at all!
Sunday, December 4, 2011
Compost Day
Lisa and Elizabeth came to help get compost bins ready for next week's visitors. Good upper body work out. Lisa is taking one of the worm composters to try at home.